Panel: Reimagining The Depot For The Energy Demands Of Electric Fleets
Building a new, or retrofitting an existing, depot to be able to support EVs with an increased dwell time to charge, and a potential need for more frequent recharging
Working with local utilities to establish grid connections and understand capacity demands, and addressing the challenges of working with utilities in different states
Accounting for the costs to install charging and energy infrastructure and how to finance them